Размер шрифта
Цвет фона и шрифта
Изображения
Озвучивание текста
Обычная версия сайта
A ready-made solution for creating a
corporate site
+7 (7212) 41–07–24
+7 (7212) 41–07–24
+7 (7212) 41–08–54
+7 (7212) 42–09–55
+7 (7212) 41–30–96
Факс
Request a callback
E-mail
ktmz@ktmz-krg.kz
Address
Kazakhstan,
Qaragandy city,
Alikhan Bokeykhan district, accounting quarter 108, building 31G
Working hours
Mon. – Fri .: from 9:00 to 18:00
Apply
About enterprise
Company
History and up-to-dateness
Production structure
Management bodies
Licenses
Quality system
Reviews
Vacancy
Products and services
Modernization and renovation of turbine equipment on a turn-key basis
Modernization and renovation of turbine equipment on a turn-key basis
Steam turbine repair
Steam turbine repair
Generator repair
Generator repair
Upgrading of automatic control systems
Composition and purpose of the EHDS
Functions EHDS
Stages of work execution
Integration with process control systems
Products and services
Technical support
Power-generating equipment automation
External station power corrector
Automatic control system for temperature and steam pressure
Automatic control system for high-speed safety and control valve
Factory overhaul of turbine and generator critical components
Factory overhaul of turbine and generator critical components
Construction and installation works
Construction and installation works
Diagnostics and commissioning
Diagnostics and commissioning
Manufacturing of turbine, generator, and auxiliary equipment components and parts
Manufacturing of turbine, generator, and auxiliary equipment components and parts
Special center-devices for turbine and generator repair
Special center-devices for turbine and generator repair
Engineering design
Engineering design
Product availability in stock
Product availability in stock
References
Energy and mining equipment, as well as steam turbine overhauls
Implemented significant facilities of capital construction
EHCS implementation
Special machine delivery
News
Contacts
Kazakhstan,
Qaragandy city,
Alikhan Bokeykhan district, accounting quarter 108, building 31G
+7 (7212) 41–07–24
+7 (7212) 41–07–24
+7 (7212) 41–08–54
+7 (7212) 42–09–55
+7 (7212) 41–30–96
Факс
Request a callback
E-mail
ktmz@ktmz-krg.kz
Address
Kazakhstan,
Qaragandy city,
Alikhan Bokeykhan district, accounting quarter 108, building 31G
Working hours
Mon. – Fri .: from 9:00 to 18:00
RU
|
EN
About enterprise
Company
History and up-to-dateness
Production structure
Management bodies
Licenses
Quality system
Reviews
Vacancy
Products and services
Modernization and renovation of turbine equipment on a turn-key basis
Steam turbine repair
Generator repair
Upgrading of automatic control systems
Power-generating equipment automation
Factory overhaul of turbine and generator critical components
Construction and installation works
Diagnostics and commissioning
Manufacturing of turbine, generator, and auxiliary equipment components and parts
Special center-devices for turbine and generator repair
Engineering design
Product availability in stock
References
Energy and mining equipment, as well as steam turbine overhauls
Implemented significant facilities of capital construction
EHCS implementation
Special machine delivery
News
Contacts
About enterprise
Company
History and up-to-dateness
Production structure
Management bodies
Licenses
Quality system
Reviews
Vacancy
Products and services
Modernization and renovation of turbine equipment on a turn-key basis
Steam turbine repair
Generator repair
Upgrading of automatic control systems
Power-generating equipment automation
Factory overhaul of turbine and generator critical components
Construction and installation works
Diagnostics and commissioning
Manufacturing of turbine, generator, and auxiliary equipment components and parts
Special center-devices for turbine and generator repair
Engineering design
Product availability in stock
References
Energy and mining equipment, as well as steam turbine overhauls
Implemented significant facilities of capital construction
EHCS implementation
Special machine delivery
News
Contacts
+7 (7212) 41–07–24
+7 (7212) 41–08–54
+7 (7212) 42–09–55
+7 (7212) 41–30–96
Факс
Request a callback
E-mail
ktmz@ktmz-krg.kz
Address
Kazakhstan,
Qaragandy city,
Alikhan Bokeykhan district, accounting quarter 108, building 31G
Working hours
Mon. – Fri .: from 9:00 to 18:00
RU
|
EN
Телефоны
+7 (7212) 41–07–24
+7 (7212) 41–08–54
+7 (7212) 42–09–55
+7 (7212) 41–30–96
Факс
Заказать звонок
About enterprise
About enterprise
Company
History and up-to-dateness
Production structure
Management bodies
Licenses
Quality system
Reviews
Vacancy
Products and services
Products and services
Modernization and renovation of turbine equipment on a turn-key basis
Modernization and renovation of turbine equipment on a turn-key basis
Modernization and renovation of turbine equipment on a turn-key basis
Steam turbine repair
Steam turbine repair
Steam turbine repair
Generator repair
Generator repair
Generator repair
Upgrading of automatic control systems
Upgrading of automatic control systems
Composition and purpose of the EHDS
Functions EHDS
Stages of work execution
Integration with process control systems
Products and services
Technical support
Power-generating equipment automation
Power-generating equipment automation
External station power corrector
Automatic control system for temperature and steam pressure
Automatic control system for high-speed safety and control valve
Factory overhaul of turbine and generator critical components
Factory overhaul of turbine and generator critical components
Factory overhaul of turbine and generator critical components
Construction and installation works
Construction and installation works
Construction and installation works
Diagnostics and commissioning
Diagnostics and commissioning
Diagnostics and commissioning
Manufacturing of turbine, generator, and auxiliary equipment components and parts
Manufacturing of turbine, generator, and auxiliary equipment components and parts
Manufacturing of turbine, generator, and auxiliary equipment components and parts
Special center-devices for turbine and generator repair
Special center-devices for turbine and generator repair
Special center-devices for turbine and generator repair
Engineering design
Engineering design
Engineering design
Product availability in stock
Product availability in stock
Product availability in stock
References
References
Energy and mining equipment, as well as steam turbine overhauls
Implemented significant facilities of capital construction
EHCS implementation
Special machine delivery
News
Contacts
Apply
+7 (7212) 41–07–24
Телефоны
+7 (7212) 41–07–24
+7 (7212) 41–08–54
+7 (7212) 42–09–55
+7 (7212) 41–30–96
Факс
Заказать звонок
Kazakhstan,
Qaragandy city,
Alikhan Bokeykhan district, accounting quarter 108, building 31G
ktmz@ktmz-krg.kz
Mon. – Fri .: from 9:00 to 18:00
News
Home
—
News
The final work is being carried out to replace the stator rods of the TZV-63 turbogenerator, station No. 3, at the thermal power plant of JSC SSGPO. Assembly of the turbine and launch of the turbine unit into commercial operation is planned for February 2
Current repairs of the turbine unit K-100-90 LMZ station No. 4 of GRES Topar LLP were carried out.
In October 2023, the T-86-90 LMZ turbine unit No. 6 of GRES Topar LLP was put into routine repair.
In November 2023, a major overhaul of the PT-60-90/13 LMZ turbine and the TVF-60-2 generator, station No. 7, was completed at the Balkhash CHPP (Kazakhmys Energy LLP).
The planned overhaul of the T-50/60-8.8-0.12 KTZ turbine and the TZFP-63-2MUZ turbogenerator station No. 4 at the Zhezkazgan CHPP (Kazakhmys Energy LLP) was completed.
The drive turbine T-30-90-1 NZL of the turbocharger K-7000-41-1 st. No. 6 was put into commercial operation after an emergency repair.
Generator type TVF-100-2 st. No. 2 of ArcelorMittal Temirtau JSC was put out for emergency repair
A major overhaul of the turbine unit R-6-30 KTZ st. No. 1 of Aktobe Thermal Power Plant JSC was completed
06/22/2023 turbine unit PT-29/35-2.9/1.0 st. No. 4 of Aktobe CHPP JSC was put into routine repair
In May 2023, the production of a new rotor and coupling half of the T-30-90 turbine was completed
Load more
1
2
3
4