Implemented significant facilities of capital construction
№ |
Customer |
Year of implementation of work |
Implemented capital construction projects at energy and metallurgy facilities |
1 |
Installation, under general contract terms, of equipment at the Balkhash Zinc Plant, Balkhash, Kazakhstan |
2003 - 2005 |
Equipment of oxygen and compressor stations with metal structures and process pipelines |
2 |
Installation, on the terms of the General Contract, of power unit No. 6 of the CHPP of JSC "SSGPO" consisting of a turbine, boiler, generator and general station equipment, Rudny, Kazakhstan |
2007 - 2010 |
Installation of turbine type K-63-90, steam generator type BKZ-280-9.8-510, generator TF-63-2U3, switchgear RUSN-6kV and 0.4kV, transformer TDTN-80000/110, circulation pump, electrical and general station equipment , with the introduction of EGSR produced by QTMP |
3 |
Installation of turbine under subcontract terms of Karaganda Energy Center LLP, Karaganda, Kazakhstan |
2011 - 2012 |
Installation of a turbine type T-120/140-12.8 LMZ, with the introduction of EGSR produced by QTMP |
4 |
CHPP JSC "Sokolovsko-Sarbaiskoye Mining and Processing Production Association", Rudny |
2013 |
Manufacturing of a new turbine rotor TR-55-90 |
5 |
Installation, under general contract terms, of turbine No. 5 of ArcelorMittal Temirtau JSC, Temirtau, Kazakhstan |
2013 - 2014 |
Installation of turbine PT-60-90/13 LMZ with auxiliary and electrical equipment, excitation system and instrumentation, with the introduction of EGSR produced by QTMP |
6 |
Installation, under general contract terms, of turbine No. 4 of ArcelorMittal Temirtau JSC, Temirtau, Kazakhstan |
2015 - 2016 |
Installation of turbine PT-60-90/13 LMZ with auxiliary and electrical equipment, excitation system and instrumentation, with the introduction of EGSR produced by QTMP |
7 |
Balkhash CHPP, KazakhmysEnergy LLP |
2016 |
Reinstallation of steam turbine PT-60-90/13/2.5 with modernization and overhaul of turbine components and auxiliary equipment |
8 |
CHPP-PVS, ArcelorMittal Temirtau JSC, Temirtau |
2016 |
Manufacturing of a new CHP rotor for the PT-60-90/13/2.5 turbine |
19 |
CHPP-PVS, ArcelorMittal Temirtau JSC, Temirtau |
2016 |
Manufacturing of a new turbocharger rotor K-7000-41-1 |
10 |
Karaganda CHPP-3, Karaganda Energy Center LLP |
2017 |
Manufacturing of a new rotor for the turbine T-100/120-130-3 |
11 | CHPP JSC "SSGPO" | 2019 | Reconstruction of heating unit No. 3 with replacement of high pressure hose, high pressure valve, cylinder flow part |
12 | JSC ArcelorMittal Temirtau CHPP-2 | 2021 | Renovation and modernization of the T-100-130 t/a with the replacement of the HPC, HPC, HPC and CSD flow parts, modernization of bearings |